Sukleji Dam
Sukleji Dam
| Sukleji Dam | |
|---|---|
| Country | Pakistan |
| Location | Bolan District, Balochistan |
| Status | Under construction |
| Construction cost | US$ 63 Million |
| Owner(s) | Government of Balochistan |
| Dam and spillways | |
| Type of dam | Zoned earth-filled dam |
| Height | 110 feet |
| Reservoir | |
| Capacity | 42000 AF |
| Power station | |
| Installed capacity | 0.16 MW |
Sukleji dam is a proposed dam located across Sukleji River in Bolan District of Balochistan, Pakistan.
The zoned earth-filled dam will be used for irrigation and hydro power generation and will have an installed capacity of 0.16 MW. The dam will have gross storage of 42000 acre feet and a command area of 12,000 acre
Akhori Dam
| Akhori Dam | |
|---|---|
| Official name | Akhori Dam (proposed) |
| Location | Across Nandnakas near Akhori village about 28 KM east of AttockPunjab |
| Construction began | Study Complete |
| Construction cost | $1.6 Billion Est. |
| Dam and spillways | |
| Height | 122 meters (400 Ft) |
| Length | 5.16 Km (3.23 Miles) |
| Impounds | Haro River |
| Reservoir | |
| Creates | Akhori reservoir |
| Capacity | 8.6 billion cubic meters (seven million acres feet) |
| Power station | |
| Installed capacity | 600 MW (proposed) |
| Website AKHORI DAM | |
AKHORI DAM
LOCATION
Akhori Dam site is loacted near Akhori Village across Nandna Kas, a small tributary of Haro River in Attock District of Punjab.
OBJECTIVES
(i) Storage of water for:
a. Supplementing Indus Basin Irrigation System and
(ii) Power Generation
SALIENT FEATURES
Dam Type: Earth & Rock Fill
Height 400 feet
Gross Storage 7.6 MAF
Live Storage 6.00 MAF
Saddle Dam
Height 213 feet
Length 4.78
Conveyance Channel
Conveyance Channel Length 23 Miles (37 Km)
Conveyance Channel Capacity 60,000 Cusecs
Bed Width
249.3ft (76 m)
Depth
32..8ft (10 m)
Installed Capacity
Hydel Power Potential
600 MW (2155 GWh/Annum)
Environmental and Resettlement
No of Affectees
55800
No of Houses
9270
Land
65976 Acres
Roads
102 Kms
Estimated cost
US$ 4.40 Billion
Construction Period
5 Years
Current Status
- PC-II approved for Rs. 194.804 million by CDWP through circulation in March
19, 2004.
- Final Feasibility Study Report has been received on Jan. 26,2006.
- PC-II for Detailed Engineering Design and Tender Documents of the Project
amounting to Rs. 818.00 Million submitted on June 23, 2006 for approval of
ECNEC.
- PC-I for land acquisition and resettlement of Affectees under approval of
ECNEC.
- Pre- qualification of consultants for detailed engineering design completed.
- RFP for inviting financial and technical proposals of Consultants for detailed
engineering design in progress.
- Revised PC-II for feasibility study amounting to Rs. 286.857 million submitted to
Planning Commission for approval.
|
04 June 2013
PML-N worker Haseena Bibi from Bahawalpur (Inspirational Story)
Inspirational Story of PML-N worker Haseena Bibi from Bahawalpur
Dadi Amman kehti hen Chand pey peryan rehti hen
Famous Poem for childern "Dadi Amman kehti hen chand pey peryan rehti hen.
DailyMotion
Dadi Amman kehti hen chand pey peryan rehti hen by dm_51ac521f70805
Chand Din Baad
Subscribe to:
Posts (Atom)
.jpg)







.jpg)